• Pipa Rat

    Pipa Rat

    琵琶鼠 (Chinese)

    Followed by 4 people


    Authors: --

    Status:Ongoing

    View:1,247

    Genres: Historical Slice of Life One Shot

    Rating: 0/10 (0 votes)

    Vote:


    Summary

    Pipa Rat manga summary: A semi-autobiographical story by renowned Taiwanese scriptwriter, director, and author Wu Nien-jen, chronicling his childhood in the mining town of Jiufen and his interactions with a strange father-son pair known only as "Rat" and "Rat-ling."

    Show More

    Top collections containing this manga

    Gonna read. ..
    Creator: Hanasaki 5 79,664

    Pinned Comments

    Newest Comments

    Recommendations

    Love the Despair

    Ongoing

    3.87/10 13,361

    Chapter 9


    The Shuryou

    Ongoing

    3.67/10 23,177

    Vol.1 Chapter 4: Tamako, The Lover (Ver.2)


    Kyoukasho wa Oshiete Kurenai Nihon Bunga...

    Ongoing

    10/10 3,159

    Vol.1 Chapter 4 : Okubyou Na Kimi No Te


    Sweet Dreams

    Ongoing

    6.22/10 14,869

    Vol.1.4 Chapter 0


    Daiya no A - Koushiki Guide Book

    Ongoing

    8.39/10 54,953

    Vol.2 Chapter 1 : Face


    The Name of the Cat is Matasaburou

    Hataya

    Ongoing

    10/10 1,709

    Oneshot


    Kimetsu no Yaiba - Zenitsu and Nezuko Af...

    Yukiharu

    Completed

    8.71/10 20,093

    Chapter 0 : Vol.0


    Deranged Ronin

    Sasaki, Maki

    Completed

    2/10 1,514

    Chapter 0


    Loading...
    Loading...
    The manga was added to your collection!